Tuesday, December 23, 2025
Teesdale Mercury
  • News
  • Features
  • Test Drive
  • Sport
  • Buy your paper
  • Buy our photos
  • Digital edition
  • Contact
No Result
View All Result
  • News
  • Features
  • Test Drive
  • Sport
  • Buy your paper
  • Buy our photos
  • Digital edition
  • Contact
No Result
View All Result
Teesdale Mercury
No Result
View All Result
ADVERTISEMENT

Work will tackle build-up of silt at river dam

by Nicky Carter
August 21, 2019
in News
Work will tackle build-up of silt at river dam

WORK PLANNED: The Spring Mill Wildlife Dam was created in the wake of floods at the turn of the millennium

FLOOD defences in a Gaunless Valley village are to undergo improvement works in the coming weeks.

The Spring Mill Wildlife Dam was created after devastating floods that affected more than 400 homes in West Auckland and South Church 19 years ago when the River Gaunless and Oakley Beck burst their banks.

Worked started on the £7.8 million pound flood defence scheme in 2003 and took three years to complete.

ADVERTISEMENT

The River Gaunless was diverted from its natural course into a new channel and a 15ft dam located behind properties at Spring Gardens was created. Walls and embankments along the river were also built to blend in with the surroundings and protect homes and businesses from further flooding.

Since the defences were installed the Environment Agency has had to remedy problems relating to the build up of silt deposits on several occasions, most recently in 2015 when part of the channel feeding the dam was re-designed to reduce the problem.

Now the Environment Agency is proposing to carry out improvement works to these flood defences.

ADVERTISEMENT

The proposed improvements include replacing an existing inlet debris screen and two ramps to allow easier access for maintenance.

The works will also narrow the channel immediately upstream of the screen to reduce the settlement of silt.

The Environment Agency says the improvement works are not likely to have significant effects on the environment and does not intend to prepare an environment statement in respect of them.

Anyone wishing to make representations in relation to the likely environmental effects of the proposed improvements work needs to write to Dr Cliff Jessett at The Environment Agency in Newcastle by September 1.

ADVERTISEMENT
Previous Post

Dale dams inspected three times a week – water bosses

Next Post

Clean-up at site of historic railway bridge

ADVERTISEMENT
No Result
View All Result

Stay connected

Facebook Twitter
ADVERTISEMENT

Most popular

Bus shelter artwork celebrates Ingleton’s charms

Bus shelter artwork celebrates Ingleton’s charms

December 17, 2025
Shoppers urged to make most of Middleton-in-Teesdale this Christmas

Shoppers urged to make most of Middleton-in-Teesdale this Christmas

December 19, 2025
Muscle car for 21st century drivers

Muscle car for 21st century drivers

December 21, 2025
It’s panto time at The Witham

It’s panto time at The Witham

December 20, 2025
Clever twists in Jack and the Beanstalk

Clever twists in Jack and the Beanstalk

December 17, 2025
Cosy cake shop and cafe lights up Barnard Castle

Cosy cake shop and cafe lights up Barnard Castle

December 19, 2025
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT

15C Harmire Enterprise Park
Barnard Castle
Co Durham
DL12 8BN

Email: [email protected]

Registered in England as Barrnon Media Limited. No: 12475190

VAT registration number: 343486488

Explore

  • Art & Leisure
  • Business
  • Country Life
  • Features
  • News
  • Sport
  • Test Drive
  • Digital edition

Useful links

  • Contact Us
  • Advertise
  • Buy your paper
  • Photosales
  • Digital edition
  • About us

Follow us on

© Barrnon Media Limited 2025

Terms & Conditions / Privacy Policy / Cookie Policy

This website and its associated newspaper are members of the Independent Press Standards Organisation
No Result
View All Result
  • News
  • Features
  • Test Drive
  • Sport
  • Buy your paper
  • Buy our photos
  • Digital edition
  • Contact

© 2024