Sunday, June 8, 2025
Teesdale Mercury
  • News
  • Features
  • Test Drive
  • Business
  • Sport
  • Art & Leisure
  • Buy your paper
  • Buy our photos
  • Digital edition
  • Contact
No Result
View All Result
  • News
  • Features
  • Test Drive
  • Business
  • Sport
  • Art & Leisure
  • Buy your paper
  • Buy our photos
  • Digital edition
  • Contact
No Result
View All Result
Teesdale Mercury
No Result
View All Result
ADVERTISEMENT

Eco-centre construction hit by overnight break-in

by Martin Paul
October 22, 2021
in Country Life
Eco-centre construction hit by overnight break-in

BUILDING BLOCKS: Martin and Philip Bacon with the Isotex block building system that is being used to construct the eco-centre at Rotter's Startforth site

CONSTRUCTION of a new eco-centre at Teesdale Conservation Volunteers’ (Rotters) site in Startforth has been delayed after thieves made off with all the building tools.
Burglars broke in overnight on Wednesday, October 6.
The setback came after site operator Martin Bacon and his wife Jill had spent a week be laying the first of the special Isotex blocks that will make up the walls and had reached window level when the break in happened.
Their son, Philip, said: “It flies up with these blocks, it is like stacking Lego blocks.”
The blocks, which are manufactured in Italy, are made of woodchip bound by cement. Once in place, concrete is poured into cavities to secure the wall. Rebar is inserted into the cavities near door and window frames to reinforce the walls.
Martin Bacon said: “It is looking good and obviously for us building it as inexperienced people it is a lot easier than traditional methods.
“Jill has laid most of these while I was cutting the blocks. It took about three days to get everything up to window level.”
The area of the building is 121sqm and reaching window level is seen as a milestone because as this is when they will make their first concrete pour before continuing upwards.
Mr Bacon said: “We have to make sure everything is level before we start pouring.”
Once completed the centre will feature a host of environmentally-friendly technology to showcase which might work in people’s homes or businesses.
These include systems to recycle drain water for use to flush toilets and irrigate plants, and a variety of heating systems.

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Previous Post

Junior cricket: Raby reflects on a successful season

Next Post

Excellence award for farm shop extension

ADVERTISEMENT
No Result
View All Result

Stay connected

Facebook Twitter
ADVERTISEMENT

Most popular

Barnard Castle promoted to Wearside League Premier Division

Barnard Castle promoted to Wearside League Premier Division

June 3, 2025
Happy birthday to life-changing group

Happy birthday to life-changing group

June 4, 2025
Royal date for youngsters to collect awards

Royal date for youngsters to collect awards

June 5, 2025
Tributes to former nurse and charity worker

Tributes to former nurse and charity worker

June 6, 2025
1940s hut to be knocked down behind primary school

1940s hut to be knocked down behind primary school

June 3, 2025
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT

15C Harmire Enterprise Park
Barnard Castle
Co Durham
DL12 8BN

Email: [email protected]

Registered in England as Barrnon Media Limited. No: 12475190

VAT registration number: 343486488

Explore

  • Art & Leisure
  • Business
  • Country Life
  • Features
  • News
  • Sport
  • Test Drive
  • Digital edition

Useful links

  • Contact Us
  • Advertise
  • Buy your paper
  • Photosales
  • Digital edition
  • About us

Follow us on

© Barrnon Media Limited 2025

Terms & Conditions / Privacy Policy / Cookie Policy

This website and its associated newspaper are members of the Independent Press Standards Organisation
No Result
View All Result
  • News
  • Features
  • Test Drive
  • Business
  • Sport
  • Art & Leisure
  • Buy your paper
  • Buy our photos
  • Digital edition
  • Contact

© 2024